Contract Change Order = Bennett Design Resource

Contract Change Order-Bennett Design Resource-East Edge

Date: 8/6/2021

Contractor: Bennett Design Resource

Project Name: East Edge

You are directed to make the following changes to the contract.

Square Footage for kitchens in the C units went up from 57.25 to 70.5, total of 66.25 Add'l sf(2,252.50)

12" Metal bar supports, 4 per unit, 44 total @ $20 per bar. ($880)

Original Contract Sum: $35,890.00

Total Amount of This Change Order: $3,132.50

The new contract amount including this change order will be: $39,022.50